Bathroom renovation: to Begin

The bathroom is a room with unique terms: high humidity, humidity differences. That’s why making fixes in the bathroom, you need vsyakuhnya.ru to definitely plan the whole working process, to think about the sequence of steps to be achieved. Within the following guide, you will find out where to begin the fix in the bathroom and what types of work ought to be performed together with your own hands. Step-by-step directions for toilet repair

Phase 1: Establishing a strategy and deciding upon a layout solution.

Repair in the toilet can be of 2 types:

  • Unplanned, spontaneous, originating from the will of unforeseen conditions. For example, in case of a pipe burst, flooding by neighbors.
  • Planned, which is either cosmetic or capital. It requires preparation, serious fiscal investment and time.

Begin repairs at the toilet is to find out the plan, interior. Think through the last detail, what’s going to be the space, pick a colour. Pastel colors are traditional, as well as a mixture of blue and blue, black or cherry with beige.

Begin repairs in the toilet is to find out the design, interior layout. Consider detail, what will be the space, select a colour. Pastel colours are thought to be traditional, as well as a combination of colours.

The next point is the selection of facing substance. As a rule, finishing at the bathroom is done with vinyl, porcelain tiles, mosaicand vinyl panels. Check the pipes, if it has to be replaced. If necessary, pick an appropriate choice. Proceed to the measuring function: step all sides, calculate the area of the area. Based on these data, we mark the location of these plumbing fixtures.

Step 2: the selection of sanitary fixtures and material for completing.

It is very important to realize that the purchase of sanitary ware simplifies the preparation stage, rather than vice versa. This usually means that first we create a new design project, create a plan, and then go to the shop. The following thing – you should specify how big your favorite plumbing fixtures and check the plan, whether it matches.

It’s very important to understand that the cost of plumbing fixtures is completed by a preparation period, and not vice versa. This means that first we create a design project, make a plan, then go to the shop. Another one

In terms of materials for completing, it’s preferable to get them instantly for the entire repair cycle, in order that then you will not be distracted if something has been missing. Remember about preparing the necessary tools.

Step 3: dismantling plumbing and tiling.

After All of the preliminary work is done, proceed to the Start of the work process:

  • Remove the sink and bathtub from the area, even if they won’t be replaced with fresh ones. In this way, you may keep them clean and undamaged.
  • Eliminate the old tile, cleaning following it all of surfaces: ceiling, walls, floor.
  • Remove old paint from the walls, if they were formerly painted, as the adhesive solution or a new layer of paint won’t adhere to surface.

Measure 4: Cost of communications: pipes, electric wiring.

Quite frequently in an older home, you ought to carefully inspect and replace not only the pipes which are in the toilet itself, but in addition the principal riser, and at times the interfloor plumbing. Why is it worth doing this? Old pipes anytime can give a flow, and then the new repair is going to be spoiled, it will require extra investment to get rid of defects.